Resistive and Reactive Load Bank Testing
Scheduled load bank testing of backup generators is recommended to prevent the potential for loss in the event of a power failure. When testing an emergency generator configuration, the engine, generator and control systems should all be evaluated.
Resistive and reactive load bank tests can be used in place of a facilities load test. A load bank is a self-contained, unitized, systematic device that includes load elements with control and accessory devices. This article discusses resistive and reactive load back testing
- which are both testing services offered by Diesel Service & Supply. Click below to read more...
Click Here: Resistive and Reactive Load Bank Testing
Follow Us For Inventory Updates, Videos & Informative Articles!
|
|
|
Cummins 625 kW
2006 Natural Gas Generator, 480 V,
3-Phase, 60 Hz, 941 Amps, Continuous
1.1 Hours, Unit#: 87233
|
MTU 750 kW
2004 Diesel Generator, 480 V,
3-Phase, 60 Hz, 1128 Amps, Standby,
247 Hours, Unit#: 87158
|
|
Caterpillar 1500 kW
2011 Diesel Generator, 480 V,
3-Phase, 60 Hz, 2255 Amps, Standby
94.8 Hours, Unit#: 87165
|
Cummins 2000 kW
2001 Diesel Generator, 277/480 V,
3-Phase, 60 Hz, 2706 Amps, Standby,
241 Hours, Unit#: 87173
|
|
|
|
|
Equipment Used to Implement Automatic Transfer System (ATS)
(Electrical-Engineering-Portal.com) This article lists commonly encountered variations in automatic transfer system equipment; however, the equipment which is used to implement the automatic transfer system can vary. |
Inside the Crystal Ball: What Will the Energy Utility of the Future Look Like?
(ForesterNetwork.com) By the year 2030, researchers predict that the energy landscape as we know it will look markedly different, as will the role of the energy utility. |
Designing Medium-Voltage Electrical Systems (csemag.com) Engineers should know how nominal system voltages were established, what constitutes a medium-voltage electrical system, and what range of systems are considered appropriate for medium voltage. |
There's No Backup System if GPS Fails (NextGov.com) Concern for the consequences of the country's reliance on this invisible utility has been growing among industry and government workers for more than 15 years. |
|
|
|
Caterpillar (3608 Genset) |
2250 kW |
Waukesha (Natural Gas) |
2100 kW |
Kohler |
2000 kW |
Cummins |
1500 kW |
Kohler |
1350 kW |
Baldor (Trailer Mounted) |
1250 kW |
Cummins |
1000 kW |
Caterpillar |
600 kW |
Detroit |
600 kW |
Kohler |
400 kW |
Caterpillar |
300 kW |
Cummins |
230 kW |
Daewoo |
200 kW |
Olympian |
150 kW |
|
|
|
|
|
|
|